E-Line Safety Audit

Pre-Job Safety Audit for Electric Line Operations

⚑ Electric Line Operations
πŸ“‹ Job Information
πŸ“ Pre-Job Planning
ItemYesNoN/A
JSA/JHA reviewed with crew
Work permit obtained
Hot work permit (if required)
Confined space permit (if required)
Emergency action plan reviewed
Client-specific requirements reviewed
Pre-job safety meeting held
πŸ‘· Personnel & Training
ItemYesNoN/A
First Aid/CPR training current
PPE appropriate for task
πŸš› E-Line Unit & Equipment
ItemOKDeficientN/A
Unit pre-trip inspection complete
Tools inspected and ready
πŸ”§ Pressure Control Equipment
ItemOKDeficientN/A
Lubricator condition
Annual Lubricator Inspection complete and Color Coded Correctly
WLV installed correctly
WLV function tested
πŸ“Š Pressure Testing
πŸ”— Rigging & Sheaves
ItemOKDeficientN/A
Sheave properly aligned
Weight indicator working
⚑ Electrical Safety
ItemOKDeficientN/A
Unit properly grounded
Bonding verified
Electrical connections secure
πŸ›’οΈ Well Site Safety
ItemOKDeficientN/A
Well status verified with client
Wellhead condition acceptable
🌍 Site Conditions
ItemOKDeficientN/A
Access/egress routes clear
Work area barricaded
Housekeeping acceptable
πŸ“» Communications
ItemYesNoN/A
Radio check complete
Emergency contacts posted
βœ… Audit Result
Select audit result above
πŸ“Έ Photos (0/6)