β Back to Portal
E-Line Safety Audit
Pre-Job Safety Audit for Electric Line Operations
β‘ Electric Line Operations
π Job Information
Auditor Name *
Date *
Job Number *
Company *
-- Select Company --
A-C Electric
AKE-Line
Apache Corp.
Armstrong Oil & Gas
ASRC Energy Services
CCI-Industrial
Chosen Construction
CINGSA
Coho Enterprises
Conam Construction
ConocoPhillips
Five Star Oilfield Services
Fox Energy Services
G.A. West
GBR Equipment
GLM Energy Services
Graham Industrial Coatings
Harvest Midstream
Hilcorp Alaska
MagTec Alaska
Merkes Builders
Narwhal Exploration
Nordic-Calista
Parker TRS
Peninsula Paving
Pollard Wireline
Ridgeline Oilfield Services
Santos
Summit Excavation
Tesoro Refinery
Yellowjacket
Other
Location *
-- Select Location --
Kenai
CIO
Beaver Creek
Swanson River
Ninilchik
Nikiski
Other Kenai Asset
Deadhorse
Prudhoe Bay
Kuparuk
Alpine
Willow
ENI
PIKKA
Point Thompson
North Star Island
Endicott
Badami
West Harrison Bay
Other North Slope
Well Name/ID *
Client Representative
E-Line Unit ID *
Crew Size
π Pre-Job Planning
Item
Yes
No
N/A
JSA/JHA reviewed with crew
Work permit obtained
Hot work permit (if required)
Confined space permit (if required)
Emergency action plan reviewed
Client-specific requirements reviewed
Pre-job safety meeting held
π· Personnel & Training
Item
Yes
No
N/A
Crew training certifications current
Well control certification current
H2S training current
First Aid/CPR training current
PPE appropriate for task
FRC/Nomex worn by all personnel
π E-Line Unit & Equipment
Item
OK
Deficient
N/A
Unit pre-trip inspection complete
Drum and cable condition
Measuring device calibrated
Depth counter zeroed
Weak point installed and verified
Cable head inspected
Tools inspected and ready
π§ Pressure Control Equipment
Item
OK
Deficient
N/A
Lubricator condition
Lubricator pressure rating adequate
Grease injection head condition
Stuffing box condition
Flow tubes inspected
BOP installed correctly
BOP function tested
BOP pressure rating adequate
π Pressure Testing
Low Pressure Test: *
Pass
Fail
N/A
High Pressure Test: *
Pass
Fail
N/A
Pressure Tests Documented? *
Yes
No
π Rigging & Sheaves
Item
OK
Deficient
N/A
Sheave wheel condition
Sheave properly aligned
Weight indicator working
Gin pole/mast secured
Guy wires properly tensioned
Floor anchors secure
β‘ Electrical Safety
Item
OK
Deficient
N/A
Unit properly grounded
Bonding verified
Electrical connections secure
Cable insulation intact
Control panel condition
π’οΈ Well Site Safety
Item
OK
Deficient
N/A
Well status verified with client
Wellhead condition acceptable
Pressure readings noted
Flow line secured
Kill line available
π Site Conditions
Item
OK
Deficient
N/A
Access/egress routes clear
Work area barricaded
Wind conditions acceptable
Weather conditions acceptable
Lighting adequate
Housekeeping acceptable
π» Communications
Item
Yes
No
N/A
Radio check complete
Emergency contacts posted
Muster point identified
Client communication established
β Audit Result
Overall Audit Result *
-- Select --
β Pass - All Items OK
β οΈ Pass - Minor Issues Noted
β Fail - Critical Issues Found
Job Approved to Proceed? *
-- Select --
Yes - Approved
No - Not Approved
Conditional - With Corrective Actions
Select audit result above
Critical Issues Found? *
Yes
No
Additional Comments
πΈ Photos (0/6)
π· Take Photo
π Choose Files
Submit E-Line Safety Audit
AnthroSafeβ’ Field Driven Safety
|
Β© 2026 SLP Alaska, LLC