← Back to Portal
SLP Alaska
🚧 OSHA 1926 Subpart P

Excavation & Trenching Permit

SLP Alaska Safety Management System

📋 Permit Information
📐 Excavation Details
📞 Utility Locating (One-Call/811)
⚠️ Call 811 at least 48 hours before digging. Hand dig within tolerance zone (18" each side of marked utility).

Utility Location Status:

Electrical
Gas
Water
Sewer
Telecom
Private
🧪 Soil Classification
🛡️ Protective Systems
⚠️ OSHA requires protective systems for excavations 5 feet or deeper (4 feet if hazardous conditions exist).
👷 Competent Person
A competent person must be designated to perform daily inspections and have authority to take corrective action.
🪜 Access & Egress
Excavations 4 feet or deeper require a ladder, ramp, or other safe means of egress within 25 feet of workers.
Ladder Access
Ladder Spacing ≤25ft
Ramp Access
Steps/Stairs
🚧 Site Safety Controls
Spoil Pile ≥2 ft from Edge?
Surface Water Controls?
Dewatering Required?
Traffic Controls in Place?
Barricades/Fencing?
Warning Signs Posted?
Adjacent Structures?
Structure Protection Plan?
💨 Atmospheric Monitoring
🚜 Mobile Equipment Safety
Mobile Equipment Used?
Spotters Required?
Stop Logs/Barricades at Edge?
Equipment Setback Maintained?
📋 Pre-Work Requirements
Area Operator Notified?
JSA/JHA Completed?
Crew Briefing Held?
Emergency Plan Reviewed?
Rescue Equipment Available?
First Aid Available?
Communication Established?
⚠️ Additional Hazard Categories

Check all additional hazards present:

Working at Heights
Confined Space
High Pressure
Critical Lifts
Traffic Exposure
Underground Utilities
Water Accumulation
Adjacent Structures
🔧 Hazard Mitigation
TaskHazardMitigation
✍️ Authorization
AnthroSafe™ Field Driven Safety|© 2026 SLP Alaska, LLC