← Back to Portal
🚧 OSHA 1926 Subpart P
Excavation & Trenching Permit
SLP Alaska Safety Management System
📝 New Permit
✅ Close Out Permit
📋 Permit Information
Permit Initiator
*
Date
*
Duration of Work
Select...
Less than 1 day
1-3 days
4-7 days
1-2 weeks
2-4 weeks
More than 1 month
Client/Company
*
Select...
A-C Electric
AKE-Line
Apache Corp.
Armstrong Oil & Gas
ASRC Energy Services
CCI-Industrial
Chosen Construction
CINGSA
Coho Enterprises
Conam Construction
ConocoPhillips
Five Star Oilfield Services
Fox Energy Services
G.A. West
GBR Equipment
GLM Energy Services
Graham Industrial Coatings
Harvest Midstream
Hilcorp Alaska
MagTec Alaska
Merkes Builders
Narwhal Exploration
Nordic-Calista
Parker TRS
Peninsula Paving
Pollard Wireline
Ridgeline Oilfield Services
Santos
Summit Excavation
Tesoro Refinery
Yellowjacket
Other
Location
*
Select...
Kenai
CIO
Beaver Creek
Swanson River
Ninilchik
Nikiski
Other Kenai Asset
Deadhorse
Prudhoe Bay
Kuparuk
Alpine
Willow
ENI
PIKKA
Point Thompson
North Star Island
Endicott
Badami
West Harrison Bay
Other North Slope
Phone/Radio
Excavation Location Description
*
Purpose of Excavation
*
📐 Excavation Details
Excavation Type
*
Select...
Trench
Bell-Bottom Pier Hole
Shaft
Open Excavation
Tunnel
Other
Estimated Depth (ft)
*
Estimated Length (ft)
Estimated Width (ft)
📞 Utility Locating (One-Call/811)
⚠️ Call 811 at least 48 hours before digging. Hand dig within tolerance zone (18" each side of marked utility).
One-Call/811 Ticket #
*
One-Call Date
Hand Dig Required?
Select...
Yes
No
Utility Location Status:
Electrical
-
Yes
No
N/A
Gas
-
Yes
No
N/A
Water
-
Yes
No
N/A
Sewer
-
Yes
No
N/A
Telecom
-
Yes
No
N/A
Private
-
Yes
No
N/A
Other Utilities
🧪 Soil Classification
Soil Classification
*
Select...
Type A - Cohesive (clay, silty clay)
Type B - Cohesive (angular gravel, silt)
Type C - Granular (gravel, sand)
Layered - Multiple Types
Unknown - Assume Type C
Classified By
Classification Method
Select...
Visual Test
Manual Test (Thumb Penetration)
Pocket Penetrometer
Shearvane
Laboratory Analysis
Multiple Methods
Previously Disturbed?
Select...
Yes
No
Water Present?
Select...
Yes
No
🛡️ Protective Systems
⚠️ OSHA requires protective systems for excavations 5 feet or deeper (4 feet if hazardous conditions exist).
Protective System Type
*
Select...
None - Under 4ft
Sloping
Benching
Shoring
Shielding (Trench Box)
Combination
PE Designed System
Sloping Angle
Select...
N/A
3/4:1 (53°) - Type A
1:1 (45°) - Type B
1.5:1 (34°) - Type C
Per PE Design
Shoring Type
Select...
N/A
Timber
Aluminum Hydraulic
Pneumatic
Screw Jacks
Other
Shielding Type
Select...
N/A
Steel Trench Box
Aluminum Trench Shield
Manhole Box
Slide Rail System
Other
Tabulated Data Available?
Select...
Yes
No
PE Design Required?
Select...
Yes
No
👷 Competent Person
A competent person must be designated to perform daily inspections and have authority to take corrective action.
Competent Person Name
*
Company
Select...
A-C Electric
AKE-Line
Apache Corp.
Armstrong Oil & Gas
ASRC Energy Services
CCI-Industrial
Chosen Construction
CINGSA
Coho Enterprises
Conam Construction
ConocoPhillips
Five Star Oilfield Services
Fox Energy Services
G.A. West
GBR Equipment
GLM Energy Services
Graham Industrial Coatings
Harvest Midstream
Hilcorp Alaska
MagTec Alaska
Merkes Builders
Narwhal Exploration
Nordic-Calista
Parker TRS
Peninsula Paving
Pollard Wireline
Ridgeline Oilfield Services
Santos
Summit Excavation
Tesoro Refinery
Yellowjacket
Other
Daily Inspections Planned?
Select...
Yes
No
🪜 Access & Egress
Excavations 4 feet or deeper require a ladder, ramp, or other safe means of egress within 25 feet of workers.
Ladder Access
-
Yes
No
Ladder Spacing ≤25ft
-
Yes
No
N/A
Ramp Access
-
Yes
No
Steps/Stairs
-
Yes
No
🚧 Site Safety Controls
Spoil Pile ≥2 ft from Edge?
Select...
Yes
No
Surface Water Controls?
Select...
Yes
No
N/A
Dewatering Required?
Select...
Yes
No
Traffic Controls in Place?
Select...
Yes
No
N/A
Barricades/Fencing?
Select...
Yes
No
Warning Signs Posted?
Select...
Yes
No
Adjacent Structures?
Select...
Yes
No
Structure Protection Plan?
Select...
Yes
No
N/A
💨 Atmospheric Monitoring
Atmospheric Testing Required?
Select...
Yes
No
Ventilation Required?
Select...
Yes
No
O₂ Level (%)
LEL (%)
H₂S (ppm)
CO (ppm)
🚜 Mobile Equipment Safety
Mobile Equipment Used?
Select...
Yes
No
Spotters Required?
Select...
Yes
No
N/A
Stop Logs/Barricades at Edge?
Select...
Yes
No
N/A
Equipment Setback Maintained?
Select...
Yes
No
N/A
📋 Pre-Work Requirements
Area Operator Notified?
Select...
Yes
No
JSA/JHA Completed?
Select...
Yes
No
Crew Briefing Held?
Select...
Yes
No
Emergency Plan Reviewed?
Select...
Yes
No
Rescue Equipment Available?
Select...
Yes
No
First Aid Available?
Select...
Yes
No
Communication Established?
Select...
Yes
No
⚠️ Additional Hazard Categories
Check all additional hazards present:
Working at Heights
Confined Space
High Pressure
Critical Lifts
Traffic Exposure
Underground Utilities
Water Accumulation
Adjacent Structures
🔧 Hazard Mitigation
Task
Hazard
Mitigation
✍️ Authorization
Work Group Leader
*
Competent Person Signature
*
Area Operator
Responsible Supervisor
*
Start Date
*
Expiration Date
*
Crew Acknowledgment
Select...
Yes
No
Issue Excavation Permit
AnthroSafe™ Field Driven Safety
|
© 2026 SLP Alaska, LLC